New Deck Posted on November 12, 2023November 12, 2023 by admin I’m finally getting time to show you what is happening with Merva.This is the first layer of 6mm plywood. It is dry fitted. More of the plywood along the port side. Hose from deck to the water tank. Note the corroded galvanised pipe!! This is the first section of covering board. It fits well next to the plywood. The second piece of the covering board I’ll dry fit the two Monday then if all goes well I’ll cut out the last two and fit them.