Paint, Survey Posted on June 21, 2021March 8, 2022 by admin Paint Scrape and sand took two people 3 x 6 hr days. Additional time to prep. and then on to painting. Interlux Primocon on the bottom (metal and wood) Bottomkote XXX on the bottom (except metal bits) Survey Spent 3 hrs on Merva with a surveyor. Went very well. Very little to do.