I got a lot completed to the point of dry fitting the covering boards and the first layer of plywood sub sheathing. Before I can permanently fasten the foredeck covering board down, I’ll need to complete the curved portion of covering board that transition between the side decks and the upper foredeck.
This is the new arrangement for aft “king plank” including the mooring bit and it’s blocking, flag standard and the aft navigation light. The new toe rail and old chocks fitted. Again everything is just dry fitted to the finished subdeck deck and will be finally installed when I get back.