Well, the wheelhouse windows and doors are finished and installed. A bit of the trim around them needs to be installed, but I’m waiting on screws. I’m replacing trim and one of the panels in the aft wheel house wall. Now that the doors at the back of the cabin are refinished, I’ve installed them…
Month: January 2022
Merva refinish
Well the holidays are behind us but the work on Merva has continued. I’ve finished varnishing the center curved window and repaired the window wiper. All that time working on those curved windows I worried that I would break one. But now, they are all installed. The last window went in at the same time…

