I decided to fetch the louver panels from the mezzanine in the boathouse and install them. It would appear that they have not been installed in a long time as I had to install supporting bits first.
Tossed 4 cans of fuel into the port side. Seems to have leveled out across starboard so no need to add fuel there. Fuel gauges a little suspect (what else is new) but the 4 cans alone is enough to get to Lund (next trip) so – no worries.